Water and Sewer Services

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

 water drop

 

The City of Social Circle is committed to supplying you with the highest quality of water possible.

How do I connect for water service?

To set up water service, please email documents in a pdf format or bring them to the Utilities Department at the drive-thru at City Hall located at 166 N. Cherokee Road. All emailed PDF documents can be sent to jturner@socialcirclega.gov.

Service can NOT be set up online.

To have services connected you will need:

1. A legal document of residency, such as a lease or closing documentation

2. The completed application

3. A copy of the driver's license for anyone listed on the account.

A deposit must be paid before services will be connected under the new account. The deposit for water is $100.00 and the deposit for gas is $200.00. 

Who do I call if there is a leak?

If you suspect a water leak and have checked to ensure that no faucets are leaking or toilets are running, please call City Hall at 770-464-2380 and ask for the Utilities Department or email rgroves@socialcirclega.gov.

water treatment

The City plans to expand sewer services 

The City has future plans for a new 3.0 million gallons per day wastewater treatment plant that can serve the city and be expanded to accommodate industrial growth.

The City also received a $1 million dollar Community Development Block Grant to make upgrades to the sewer system in the Marco Estates area. The 2022 CDBG Marco Estates Sewer Project will address failing sanitary sewer infrastructure in the Marco Estate residential area. Upgrades will include rehabilitation of sewer mains, manholes, and household connections. The goal of this project is to eliminate issues and safety hazards caused by inadequate sewer service, such as raw sewage overflows into streets, yards, and homes.

Timeline for the Marco Estates Sewer Project:

March 2023 – Survey and Design

April 2023 – Final Design Approval

May 2023 – Advertisement for Bids

June 2023 – Bid Openings

July 2023 - Recommendation of Award and Construction Contract

August 2023 – Preconstruction Conference

August 2023 - Start Construction

August 2024 – End Construction

March 2024 – Public Hearing and Project Close Out

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer