Public Works

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 Utility crew

Public Works oversees and maintains the City of Social Circle's infrastructure which includes streets, water distribution and treatment, wastewater, gas and two City cemeteries. Public Works has crews continuously working to upgrade services and City roadways.

The City is currently planning to make major upgrades to its water system to prepare for anticipated residential and commercial growth. For more background on this project, the public is invited to read the most recent draft of the Environmental Planning Document. A link can also be found on the Public Notices page.

In addition, the City has proposed making upgrades to the sewerage system to include the design and construction of a bypass regional pump station, sewer lines, force main lines, rehabilitation of sewer lines throughout the City and updates to the City’s SCADA system.

 

 

 

STAFF

Robbie Groves

Director - Robbie Groves

(770) 464-6908

Gas Superintendent - Rusty Johnson 

Sewer/Wastewater Superintendent - Jay Link

Water Supervisor - J.C. Wright

Street Superintendent - Keith Murrell

Street Supervisor - Montrea Parks (Contact City Hall at 770-464-2380 to leave a message)

 

MASTER PLANS

The Department plans and budgets for future improvements and prepares for expected population growth. Social Circle Public Works has several master plans in place.

Water Master Plan

Sewerage System Master Plan

Gas Master Plan

Sidewalk and Trails Master Plan (See map below)
Sidewalk and Trails Master




Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer