Facebooktwitterredditpinterestlinkedinmail

Call Before You Dig

Should you plan to dig around buried piping, especially buried gas piping, the piping should be located in advance and all digging should be carefully done by hand in the vicinity of the pipe. You must contact the Georgia One Call Center at 800-282-7411 (or 811) three days before any digging by you or your contractor so that all buried cable may be located. This is a free service. Flag colors and what they represent: red: electric power lines, cable, conduit and lighting cables; orange: telecommunication, alarm, or signal lines, cable or conduit; yellow: natural gas, oil, steam, petroleum or other gaseous or flammable materials; green: sewers and drain lines; blue: drinking water; purple: reclaimed water, irrigation, and slurry lines; pink: temporary survey markings, unknown/unidentified facilities; white: proposed excavation limits or route.

Facebooktwitterredditpinterestlinkedinmail